← Back to Technical Resource Hub
In Australia, AS 5369:2023 (Reprocessing of reusable medical devices, superseding AS/NZS 4187:2014 and AS/NZS 4815:2006) alongside ISO 15883-4 and GENCA guidelines mandate immediate bedside pre-cleaning and pre-reprocessing leak testing for every flexible endoscope. Use the button below to print or save the checklist below as an **A4 CSSD Wall Poster PDF**.
Step 1: Bedside Pre-Cleaning (Immediately Post-Procedure)
- Wipe insertion tube exterior from control body to distal tip with a damp, lint-free enzymatic sponge.
- Immerse distal tip in freshly prepared enzymatic detergent and suction continuously for 10–15 seconds, alternating air and fluid.
- Depress the air/water valve using the manufacturer's flush adapter to clear air/water channels.
- Flush auxiliary water channel (if fitted) and verify distal lens is free of organic debris.
- Place scope coiled loosely in a covered, rigid transport tray marked Contaminated and transfer directly to CSSD.
Step 2: Dry & Wet Pressure Leak Testing (Before Immersion)
- Remove all detachable valves (suction, air/water, biopsy cap).
- Fit the water-resistant cap securely onto the electrical video connector (required on 160/180 series; verify connector seal on 190/X1).
- Connect leak tester to venting connector and pressurize to manufacturer specification before submerging.
- Submerge entire scope in clean water; articulate distal tip fully (Up/Down/Left/Right) for 30+ seconds to expose micro-pinholes in the bending rubber.
- Inspect bending section, distal tip, insertion tube, biopsy port, control knobs, and connector boot for continuous bubbles.
Step 3: Depressurization & Manual Cleaning
- If zero bubbles are observed, remove scope from basin before turning off or disconnecting the leak tester.
- Allow internal pressure to vent completely until bending rubber relaxes, then disconnect leak tester.
- Brush all accessible channels (biopsy, suction, elevator) with single-use size-matched brushes until visibly clean.
- Flush detergent through every channel and rinse thoroughly prior to Automated Endoscope Reprocessor (AER / ISO 15883-4) cycle.
Step 4: Post-AER Drying & Vertical Storage
- Perform forced-air channel purging (or validated drying cabinet cycle) to eliminate residual moisture.
- Verify angulation locks are set to the FREE position before hanging vertically.
- Hang scopes vertically in a ventilated, AS 5369:2023 compliant storage cabinet with distal tips hanging straight and uncoiled.
- Never stack scopes or allow insertion tubes to rest against cabinet floors or sharp shelf edges.
⚠️ STOP PROTOCOL: IF A LEAK IS DETECTED
DO NOT REPROCESS OR IMMERSE FURTHER. Keep the leak tester pressurized while lifting the scope out of water to prevent fluid suction into the internal optics/CCD. Wipe dry with a clean cloth, depressurize slowly, tag FAILED LEAK TEST — DO NOT USE, and call Endoscope Services Australia on 0448 334 797 (Peter) or 0435 730 477 (Kevin) for urgent decontamination and express loaner dispatch.
Authoritative Australian Standards References
For full regulatory requirements on reusable medical device reprocessing, refer to the Australian Commission on Safety and Quality in Health Care (ACSQHC) — AS 5369:2023 Guidance and the Gastroenterological Nurses College of Australia (GENCA).
Scope Failed a Leak Test Today?
Rapid dry-out and seal repair prevents a $500 bending rubber fix from turning into a $10,000+ CCD fluid-invasion rebuild.